Q 1: Tool used for secure expert judgment
A. Peer Review
B. Delphi Technique
C. Expected value technique
D. Work Breakdown Structure (WBS)
Q2: What should be done by the project manager to ensure that all work in the project is included?
A. Create a contingency plan
B. Create a risk management plan
C. Create a WBS
D. Create a scope statement
Q3: Relationship between completion of a successor is dependent on initiation of its predecessor is known as ?
A. FS
B. FF
C. SS
D. SF
Q4: What should a project manager do or follow to ensure clear boundaries for project completion?
A. Scope verification
B. Completing a scope statement
C. scope definition
D. Risk management plan
Q 5:An organization is certified to a stringent environmental standard and uses that as the key differentiator with its competitors. Alternative method is available but involves lot of risk. What should the project team do?
A. Drop the alternative approach
B. Work out a mitigation plan
C. Procure an insurance against the risk
D. Plan all precautions to avoid the risk
Q 6: That is the objective of project manager behind the study of the work processes on a project.
A. Quality control
B. Quality planning
C. Checking adherence to processes
D. Quality assurance
Q 7:Which of the following is NOT an input to project plan execution?
A. Work authorization system
B. Project plan
C. Corrective action
D. Preventive action
Q 8: Coral reefs in India can be found in
A. the coast of Orissa
B. Waltair
C. Rameshwaram
D. Trivandrum
Direction for Question 9 Pick out the most effective word from the given words to fill in the blank to make the sentence meaningfully complete.
Q 9:Fate smiles …… those who untiringly grapple with stark realities of life.
A. with
B. over
C. on
D. round
D. 46%
Q(10) The model serves as the basis for the creation of ______ for the Software.
(a) Design
(b) Maintenance
(c) Testing
(d) Specifications
Q(11) Before requirements can be analyzed, modeled, or specified they must be gathered through a/an_______
(a) Elicitation process
(b) Interviewing
(c) Meeting
(d) None of given
Q( 12 )Technology-related problems include _____
(a) Overestimated savings from reusable components and new tools and methods
(b) Switching tools in mid-way
(c) Integrating different software products in cross-platform implementation
(d) All of given
Q(13) Insufficient identification is a
(a) Technology-related problems
(b) Process-related problems
(c) People-related problems
(d) Product-related problems
Q(14) Throughout evaluation and solution synthesis, the analyst’s primary focus is on ______
(a) “Not what, not “how”
(b) “What, also “how”
(c) “What, not “how”
(d) None of given
Q(15) The overall role of Software in a larger system is identified during
(a) Requirements engineering
(b) Process engineering
(c) System engineering
(d) All of given
Q(16) Many software projects digress from the original scope because of the nature of the software product or technology used, it’s happen in ________
(a) Product scope changed toward the end of the project life cycle
(b) Research-oriented software development
(c) Defined scope
(d) Fuzzy users
Q (17) In problem evaluation area of effort is identified by.
(a) Analyst
(b) Designer
(c) Coder
(d)Manager
Q(18) A ‘facilitator’ controls the meeting can be ________
(a) Customer
(b) A developer
(c) An outsider
(d) All of given
Q(19) Version control combines ______ to manage different versions of configuration objects that are created during software product development.
(a) Procedure
(b) Tools
(c) Procedure and Tools
(d) None of given
Q20.Many software projects digress from the original scope because of the nature of the software product or. technology used, it’s happen in ________
(a)Product scope changed toward the end of the project life cycle
(b)Research-oriented software development
(c)Defined scope
(d)Fuzzy users
Q21.When you build a product or system, it’s important to go through a series of predictable steps , the process which you follow to develop it is known as________
(a)Software design
(b)Software process
(c)Software schedule
(d)Framework
Q22.Before requirements can be analyzed, modeled, or specified they must be gathered through a/an_______
(a)Elicitation process
(b)Interviewing
(c)Meeting
(d)None of given
Q23.Defined scope is a
(a)Technology-related problems
(b)Product-related problems
(c)Process-related problems
(d) People-related problems
Q24.You can use the Item Traceability Matrix to identify _______ at the end of each phase
(a)SCIs
(b)SCM
(c)Design
(d)Construction
Q25.Most software project manager’s practice a lot of management techniques that are of doubtful authenticity are called
(a)Project management tools
(b)Project management myths
(c)Project management thumb rules
(d) Project management fundamentals
Q26.The Introduction of the software requirements specification states the
Select correct option:
(a)Goals
(b)Objective
(c)Design
(d)Goals and objectives of the software
Q27.The code generation step performs the task
Select correct option:
(a) Translated specification into a machine-readable form
(b)Translated design into a machine-readable form
(c)Translated requirements into a machine-readable form
(d)Translated user data into a machine-readable form
Q28.———–is the ability to encourage by “push or pull” technical people to produce to their best ability.
Select correct option:
(a)Evaluating
(b)Motivation
(c)None of the given
(d)Monitoring
Q29.__________contains an analysis of what went wrong, what went right, and what you could have done better in the software project.
Select correct option:
(a)Prepare closedown report
(b)Identify learning
(c)Identify reusable software components
(d)none